Investments & PPP
|
|
|
State Policy on Public Private Partnership (PPP)
|
|
The State Government is now taking up several infrastructure projects including
physical and social infrastructure with the objective of enhancing the quality of
life of the people of the State by providing better and efficient public services.
In addition to traditional public sources of funding for infrastructure projects,
alternative sources of financing have gained importance in the recent times.
|
|
The State Government, therefore, recognizes that one of the important tools for
attaining the above objective is the Public Private Partnership (PPP) model, which
represents an arrangement between a Government/Statutory bodies on one side and
a private sector entity on the other, for providing public services through new
investments or management of the existing services or both.
|
To achieve the objectives stated above, the Government has introduced a State Policy
on PPP for implementation of physical and social infrastructure projects in the
State as follows
|
- (i) The Finance Department, Government of West Bengal will be designated as the
Nodal Department;
- (ii) A dedicated PPP Cell will be created in the Finance Department, for providing
necessary direction and hand holding support to the Departments for planning and
implementation of PPP Projects;
- (iii) A dedicated Fund called West Bengal Infrastructure Development Fund (WBIDF)
will be created to assist selected project preparation activities, capacity building,
training, enhancement of project viability etc.
|
|
The objectives of the PPP Policy
|
|
The broad objectives of the PPP Policy of the Government are outlined below:
|
- a. To set out the principles for pursuing projects on PPP basis.
- b. To support Private Sector Investments and create a conducive environment so as
to enable the State to utilize Private Sector efficiencies, innovativeness, capacity,
flexibility and resources with the objective of developing both physical and social
infrastructure at optimal cost.
- c. To Provide a consistent and transparent framework for identifying, structuring,
awarding and managing PPP;
- d. To facilitate identification and creation of appropriate PPP Projects and assist
the line Departments in effective project structuring, implementation and monitoring
of the same;
- e. To provide an efficient institutional framework for speedy clearances of PPP
projects.
- f. To create a robust dispute redressal mechanism and regulatory framework for PPP
Projects;
|
|
Infrastructure Sectors to be covered
|
|
The areas that will be covered under the PPP are:
|
- Health (specific areas)
- Education (specific areas)
- Tourism related projects
- Roads, bridges and bypasses
- Airports, Airstrips and Heliports
- Inland container depots and logistics hubs
- Industrial parks, Theme Parks, Knowledge Parks, Special Economic Zones and Townships,
Industrial Training Centres
- Water Supply, Treatment and Distribution
- Power generation, transmission and distribution systems
- Solid waste management
- Drainage and Sewerage
- Inland water transport
- Urban transportation systems
- Housing and related facilities
- Any other sector / facility as may be included by the Government from time to time
|
|
The PPP Process
|
|
The healthy and efficient growth of PPP projects will call for a robust, transparent
and clearly laid out PPP process.
|
|
The Government’s Role in PPP
|
|
The role of the government will be one of a facilitator and enabler. Some supports
from the State Government which will be of critical importance are outlined below:-
|
- (i) Legislative support as and when required.
- (ii) Administrative support which shall include facilitating receipt of all Central
and State Government clearance assisting in all rehabilitation and resettlement
activities in case so required as per existing Rehabilitation and Resettlement Policy
of the State Government, facilitating provision of supply of power and water at
the project side etc.
|
|
Some of the proposed activities the State Government is expected to perform are
mentioned below:-
|
|
Identification of Projects
|
|
The State Government Departments / bodies shall identify, conceptualize the projects
to be developed in the State and place before ECOS through PPP Cell. The ECOS shall
prioritise projects based on demand and supply gaps, inter-linkages and any other
relevant parameters and create a project shelf. In order to assess the same, Pre-feasibility
Report shall be prepared by the respective Department. The Pre-feasibility Report,
would establish, inter alia, the need for the project, project cost, estimation
and indicative financial viability of the proposed project including preliminary
engineering studies, if any. Approval of the project, would then be obtained from
ECOS.
|
|
Project Development Process
|
|
The project development process would cover project preparation (including technical
feasibility and financial viability analysis), project structuring, preparation
of contractual documents and obtaining of project clearances and approval. During
this stage, activities would be undertaken with the following objectives,
|
- a. Articulate the scope of the project, implementing agency’s requirements and set
forth roles/responsibilities of the parties;
- b. Establish that the revenue model is robust and sustainable over the project life
;
- c. Ensure that the underlying risks arc defined and appropriately allocated between
the contracting parties;
- d. Ensure that the contractual arrangements and documentation accurately reflect
the scope of the project, roles and obligations of parties, performance standards,
monitoring arrangements, penal provisions, reporting requirements, dispute resolution
mechanism and termination arrangements.
- e. Ascertain that contractual arrangements are permissible under the policy, legal
and regulatory regime.
|
|
As part of the project development activities, implementing agencies would undertake
studies and investigations relating to technical, market analysis, financial and
legal aspects, with the assistance from advisors/consultants wherever required.
The output of the project development activities, to the extent feasible, would
be made available to the potential bidders during bid process.
|
|
Procurement Process
|
|
Procurement stage would cover procurement and project award. Transparent, accountable,
non — discriminatory, competitive and timely procurement processes would be followed
so as to encourage maximum participation by private sector and to imbibe public
confidence in the procedure. The procurement process would be completely transparent
and shall be in line with the procurement policies of the State.
|
|
The bid documents used for procurement of private sector entities may comprise one
or more of expressions of interest, request for qualifications, and request for
proposals. Technical proposals would be invited, depending on the complexity of
a project, to assess the ability of the private entity of their appreciation of
the desired outcomes. Financial proposals would ideally be in the form of a single
objective parameter.
|
The procurement process of a PPP may include the following distinct stages:
|
- Expression of Interest (EoI)
- Request for Qualification (RfQ)
- Request for Proposals (RfP)
- Evaluation, and selection of Bidder Award of Contract
- Signing of concession Agreement
|
|
Draft contract agreement, containing provisions on the roles and obligations of
the parties, performance standards and monitoring arrangements, reporting requirements,
penalty conditions, force majeure conditions, dispute resolution mechanism and termination
arrangements, shall be provided to the prospective bidders as part of the bid documents.
|
|
Timelines to be followed during the procurement process would be indicated by the
procurement entity in the bidding documents. In order to minimize delays, the procurement
entity would endeavour to obtain all necessary approvals for a project from the
agencies concerned in a timely manner. In case the competitive bidding process does
not generate sufficient response and if even a sole bid is not received, then the
Department shall, with the approval of ECOS, either modify the pre-qualification
criteria and / or the risk sharing provisions and restart the bid process; or may
cancel the competitive bid process.
|
|
The State Government, may formulate sector specific policies wherever required for
providing specific incentives and also establish mechanism for tariff setting, pricing,
arbitration, safety and operational standards etc. It also envisages coordination
across infrastructure sectors and dovetailing of sectoral plans. For effective implementation
of projects, certain support of the State would be required including Legislative
Support, Administrative Support and Financial Support.
|
|
Project Implementation
|
|
The process of project implementation would be appropriately backed by contractual
arrangements. The line Department would develop contractual frameworks to allow
for equitable allocation of risks between the contracting parties, taking into account
the legitimate concerns of private investors.
|
|
Model Adoption
|
|
While considering PPP Projects, it will be necessary to consider and choose the
appropriate PPP Model from among the different models generally used in this regard.
While selecting the project, attention must also be paid to the critical aspects
of the project with a view to separate outsourcing and other types of jobs from
the core PPP project.
|
|
A brief description of some of the more popular PPP Models is given below – the
appropriate model is to be adopted on a case to case basis.
|
- a. Buy — Build — Operate (BBO): Transfer of public asset to a private or
quasi¬public entity usually under contract. The assets will be upgraded and operated
tor a specified period of time. Public control to be exercised through the contract
at the time of transfer.
- b. Build — Own — Operate (BOO) : The private sector finances, builds, owns
and operates a facility or service in perpetuity. The public constraints are stated
in the original agreement and through ongoing regulatory authority. The concessionaire
retains ownership of the facility. The concessionaire bears the commercial risk
of operating the facility.
- c. Build — Own — Operate — Transfer (BOOT): A private entity receives a franchise
to finance, design, build and operate a facility (and to charge user fees) for a
specified period, after which ownership is transferred back to the public sector.
- d. Build — Operate — Transfer (BOT): The private sector designs, finances
and constructs a new facility under a long-term concession contract, and operates
the facility during the term of the concession after which ownership is transferred
back to the public sector if not already transferred upon completion of the facility.
In fact, such a form covers Build — Own — Operate — Transfer and Build — Lease —
Operate — Transfer with the sole difference being the ownership of the facility.
- e. Build — Lease — Operate — Transfer (BLOT) : A private entity receives
a franchise to finance, design, build and operate a leased facility (and to charge
user fees) for the lease period, against payment of a rent. Another model is BOLT
where one of the processes come before the other.
- f. Design — Build — Finance — Operate (DBFO): The private sector designs,
finances and constructs a new facility under a long-term lease, and operates the
facility during the term of the lease. The private partner transfers the new facility
to the public sector at. the end of the lease term.
- g. Finance Only: A private entity, usually a financial services company,
funds a project, directly or uses various mechanisms such as a long — terms lease
or bond issue.
- h. Operation & Maintenance Contract (O & M): A private operator, under contract,
operates a publicly owned asset for a specified term. Ownership of the asset remain
with the public entity.
- i. Design-Build (DB): The private sector designs and builds infrastructure
to meet public sector performance specifications, often for a fixed price on turnkey
basis. The risk of cost overrun is therefore transferred to the private sector.
- j. Operation License: A private operator receives a license or right to operate
a public service, usually for a specified term.
|
|
|
|
|
|
Institutional Framework
|
|
A strong, well defined and robust institutional structure is critical for development
of a sustainable PPP programme. In addition to creating and facilitating conducive
environment for private sector investments, a framework is needed to ensure that
the projects are commercially robust, the provisions in the contract, document safeguard
user and public interests and the contingent liabilities of the Government are kept
limited within accepted parameters. Keeping this in view, an institutional structure
comprising of existing Standing Committee of the Cabinet on Industry, Infrastructure
and Employment and Empowered Committee of Secretaries (ECOS) is conceived to take
forward the implementation of the PPP. The framework has been suggested keeping
in view the need to keep the process simple, smooth and aligned to the risks associated
with the projects.
|
|
|
|
Standing Committee of the on Industry, Infrastructure and Employment
|
|
The Standing Committee, of the Cabinet on Industry, Infrastructure and Employment
of the Government constituted vide Notification No. 1 Cab.Sub.Com dated June 29,
2011 of Government of West Bengal shall consider for approval all large value Projects
under PPP which are above Rupees Fifty Crore on the recommendation of the Empowered
Committee of’ Secretaries.
|
|
Empowered Committee of Secretaries (ECOS)
|
|
A Committee under the Chairmanship of the Chief Secretary, Government of West Bengal
will be constituted to consider for facilitation of infrastructure project under
PPP. The Committee is to be Known as empowered Committee of Secretaries (ECOS).
ECOS will lake up for approval all the PPP Projects with project cost upto Rs. 50
crore. It will also consider the PPP projects above Rs. 50 crore and recommend for
approved to the Standing Committee of the Cabinet on Industry, Infrastructure and
Employment. The other Committee members shall be Secretaries of the Departments
of Planning Urban Development, Tourism, Commerce and Industries. Power, Municipal
Affairs, Public Works Department and Finance. The ECOS may co-opt a member from
any other Department. The Finance Secretary shall be the Convener of the Committee
|
|
Terms of Reference of the ECOS
|
|
The Empowered Committee of Secretaries will
|
- a. Consider and formulate policy guidelines under PPP model
- b. Consider and approve projects being take up under PPP for Project Cost upto Rs.
50 crores
- c. Recommend to the Standing Committee of the Cabinet on Industry, Infrastructure
and Employment for consideration all eligible projects above Rs. 50 crores
- d. Standardization of Bid documents and processes in the TOR
- e. Propose optimal procurement method for PPP Projects within the stated objectives.
- f. Resolve issues relating to projects being proposed under PPP framework
- g. Resolve inter-departmental issues to ensure smooth implementation of PPP Projects
- h. Review and monitor implementation of PPP Projects
- i. Recommend enactment of legislation for ensuring appropriate regulatory mechanism/robust
dispute and grievance resolution.
|
|
Creation of PPP Cell
|
|
With a view to providing necessary direction and hand-holding support to the Departments
sponsoring PPP Projects, a PPP Cell would created in the Finance Department. The
PPP cell would co-ordinate the efforts of the different administrative department
of the State Government with regard to the development of infrastructure sectors
involving private sector participation. The Finance Secretary will act as the Nodal
Officer of the PPP Cell and will be assisted by the Special Secretary. He will also
be assisted by a PPP Expert(s), MIS Expert, Financial Expert, Public Finance Expert,
Legal and Regulatory and other supporting staff
|
|
Broad functions of PPP Cell
|
|
To provide support and technical services, the PPP Cell will have the following
broad functions:-
|
- 1) To give technical support to administrative department for identifying projects
suitable for implementation on PPP route.
- 2) Develop processes for selection and evaluation of guidelines for selection and
appointment of consultants and private sector partners.
- 3) Assist line Departments in preparing pre-feasibility and project reports through
consultants.
- 4) Assist in development of transparent, and effective tendering process.
- 5) Develop various Model documents for different sectors.
- 6) Examine the PPP projects and place it before ECOS for approval.
- 7) Coordinate the efforts of other Departments for the furtherance of the objectives
of this Policy.
- Conduct workshops and use other media to disseminate information on PPP.
- Act as the nodal agency for capacity building for PPP, through training and technical
assistance, to increase the deal flow of eligible projects.
|
|
|
West Bengal Infrastructure Development Fund (WBIDF)
|
|
In order to ensure quality project preparation, a West Bengal Infrastructure Development
Fund (WBIDF) will be set up under the Finance Department to assists elected projects.
The fund shall finance the project preparation activities such as conducting feasibility
studies, social and environment impact studies, project structuring, development
of project documents, etc. The Fund shall also assist capacity building and training.
In very selected cases, the fund may provide financial support directly to projects
to enhance project viability and enable projects to be amenable to PPP. The ECOS
shall administer the fund and prescribe detailed guidelines for management of the
Fund.
|
|
Regulatory Framework
|
|
The State Government will gradually develop a Regulatory Framework for the projects
and services rendered through a PPP.
|
|
The State Government’s role in PPP
|
|
The role of the Government under PPP may be described as one of a facilitator and
enabler. The Government would play a regulatory role by setting out policies for
economic regulation, safety standards and social rights, as a failure to do so may
result in exploitation of economic and social vulnerabilities. These projects of
social and economic relevance would therefore call for continuous monitoring and
review. Some supports from the State Government may also be necessary in legislative
and administrative matters.
|
|
The State Government will also be expected to perform in respect of:
|
- PPP Identification
- Adherence to Processes
- Project Preparation
- Procurement Stage
- PPP Contract Management and Monitoring Stage
- Post Project Award Negotiation
|
|
Documentations
|
|
A large number of documents may be required for project formulation under PPP. Names
of certain documents are listed below:
|
- i) Strategic Plan
- ii) Feasibility Report
- iii) Detailed Project Report (DPR)
- iv) Shareholders’ Agreement
- v) State Support Agreement
- vi) Operation, Maintenance and Development (OMD) Agreement
- vii) Concession Agreement
- viii) Technical Operation agreement
- ix) Lease Agreement
- x) Substitution agreement
- xi) Independent Engineer’s / Auditor’s agreement
- xii) Other subsidiary Agreement
|
|
Selection of Developer
|
|
Alter the DPR is prepared, the concerned Department may initiate the process of
selection of a suitable developer. The DPR apart from specifically indicating the
cost benefits, would spell out the award criteria, upfront. The concerned Department
may use the services of a Transaction Advisor / Consultant. The selection process
may be single or several, depending upon the size of the project.
|
|
Selection Process
|
- a. Engagement of Transaction Advisor / Consultant from the existing Panel of TAs
/ Consultants for assistance
- b. Invitation of Expression of Interest from prospective bidders
- c. Receiving proposals from bidders and evaluation of qualifications
- d. Preparation / review of Request for Proposal
- e. Pre-bid meeting for clarification / modification of bid documents
- f. Receipt of bids
- g. Evaluation of Technical and Financial Bids-Selection of most preferreddeveloper
in accordance with prescribed criteria
- h. Signing of Agreement
|
|
Competitive bidding will be adopted in all PPP projects.
|
|
|
|
|
Contents provided by the Commerce & Industries Department, Government of West Bengal
Site Designed, hosted and maintained by National Informatics Centre
Best Viewed in Internet Explorer 8.0/Firefox 3.6 or Later.
Legal Disclaimer
|
|
|